Thursday, January 28, 2010

DTN News: U.S. Department of Defense Contracts Dated January 28, 2010

DTN News: U.S. Department of Defense Contracts Dated January 28, 2010
*Source: DoD issued January 28, 2010
(NSI News Source Info) WASHINGTON - January 28, 2010: U.S. Department of Defense, Office of the Assistant Secretary of Defense (Public Affairs) Contracts issued January 28, 2010 are undermentioned;
CONTRACTS
NAVY ~Austal USA, Mobile Ala., is being awarded a $204,238,728 modification to previously awarded contract (N00024-08-C-2217) to exercise options for Ships 2 and 3 of the Joint High Speed Vessel (JHSV) program. The JHSV will provide high speed, shallow draft transportation capability to support the intra-theater maneuver of personnel, supplies, and equipment for the Navy, Marine Corps and Army. Work will be performed in Mobile, Ala., and is expected to be completed by July 2012. Contract funds will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. ~Maritime Helicopter Support Co., Woodbridge, Va., is being awarded an $84,337,927 ceiling price firm-fixed-priced performance based logistics contract for repair of various line items of the H-60 helicopter systems and components. This contract contains options which, if exercised, will bring the not-to-exceed ceiling price of the contract to $306,683,371. Work will be performed by Sikorsky Aircraft Co., Stratford, Conn. (70 percent), and by Lockheed Martin Systems Integration, Owego N.Y. (30 percent). Work is expected to be completed by Jan. 30, 2011. Contract funds will not expire at the end of the current fiscal year. This contract was not competitively procured. The Naval Inventory Control Point, Philadelphia, Pa., is the contracting activity (N00383-09-D-010F). ~United Technologies, East Hartford, Conn., is being awarded a $24,674,404 delivery order #0003 under a previously awarded basic ordering agreement contract (N00383-07-G-003M) for repair of line items used on the J-52 engine in support of the EA-6B aircraft. Work will be performed in Jacksonville, Fla., and is expected to be completed by July 2012. Contract funds will not expire before the end of the fiscal year. This contract was not competitively awarded. One company was solicited and one offer was received. The Naval Inventory Control Point, Philadelphia, Pa., is the contracting activity. ~Electric Boat Corp., Groton, Conn., is being awarded a $23,661,596 modification to previously awarded contract (N00024-03-C-2101) for the planning and execution of the USS New Hampshire (SSN 778) post shakedown availability (PSA). Specific efforts include planning efforts, including long lead time material procurement, in preparation to accomplish the maintenance, repair, alterations, testing and other work on USS New Hampshire (SSN 778) during its scheduled PSA. Work will be performed in Groton, Conn., and is expected to be completed by September 2010. Contract funds will not expire at the end of the current fiscal year. The supervisor of shipbuilding conversion and repair, Groton, Conn., is the contracting activity. ~Dck pacific construction, LLC, Honolulu, Hawaii, is being awarded a $12,687,000 firm-fixed price contract for construction of box magazines and supporting facilities at Navy Munitions Command, East Asia Division, Detachment Pearl Harbor. The work to be performed provides for the construction of five standard type “C” earth covered box magazines and supporting facilities, which include: access roads; concrete apron; interior lighting and power; exterior security lighting; grounding; building lightning protection; building electrical service; site secondary electrical distribution; and fire hydrants. Special foundation features include excavation of existing subgrade to the coral formation and concrete fill below the invert of the magazine foundation to the coral formation. Work will be performed in West Loch, Pearl Harbor, Hawaii, and is expected to be completed by December 2011. Contract funds will not expire at the end of the fiscal year. This contract was competitively procured via the Navy Electronic Commerce Online Web site with 12 proposals received. The Naval Facilities Engineering Command, Hawaii, Pearl Harbor, Hawaii, is the contracting activity (N62478-10-C-1482). ~Lockheed Martin Maritime Systems and Sensors, Moorestown, N.J., is being awarded a $9,800,000 modification to previously awarded contract (N00024-03-C-5115) for engineering services for DDG 51 class and CG 47 class Aegis combat system installation, integration, test and fleet life cycle engineering support. The required services include program management; operation support; quality assurance; configuration management; ship design integration; firmware maintenance; combat system test and evaluation; Navy furnished material support; special studies; and future-ship integration studies. Work will be performed in Moorestown, N.J. (45 percent); Baltimore, Md. (20 percent); Bath, Maine (12 percent); Pascagoula, Miss. (8 percent); Washington, D.C. (5 percent); Norfolk, Va. (5 percent); Mayport, Fla. (3 percent), Oxnard, Calif. (1 percent); and San Diego, Calif. (1 percent). Work is expected to be completed by September 2010. Contract funds will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington Navy Yard, D.C., is the contracting activity. ~BAE Systems San Diego Ship Repair, Inc., San Diego, Calif., is being awarded an $8,919,673 modification to previously awarded contract (N00024-08-C-2300) to exercise an option for the accomplishment of the post shakedown availability (PSA) for the DDG 51 class AEGIS destroyer USS Dewey (DDG 105). Specific efforts include engineering and management in support of the PSA; labor and procurement of material to correct government responsible deficiencies and accomplish system upgrades; perform specified PSA work items inclusive of tests and post repair sea trials; and task additional manhours and material in order to complete emergent repairs. Work will be performed in San Diego, Calif., and is expected to be completed by December 2010. Contract funds will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. ~L3 Services, Inc., Mount Laurel, N.J., is being awarded a $7,454,671 modification to a previously awarded cost-plus-award-fee contract (N00421-05-C-0009) to exercise an option for engineering and technical services and supplies to design, develop, procure, prototype, modify, integrate, install, test and evaluate, and provide logistics support for telecommunication and related communication-electronic systems. These services are in support of the Naval Air Warfare Center Aircraft Division, Special Communications Requirements Division. The estimated level of effort for this modification is 72,368 man-hours. Work will be performed in Lexington Park, Md. (80 percent), and Saint Inigoes, Md. (20 percent), and is expected to be completed in April 2010. Contract funds will not expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Patuxent River, Md., is the contracting activity. ~Dyncorp International, LLC, Fort Worth, Texas, is being awarded a $6,745,095 firm-fixed-price contract for continued contractor logistics support for 12 U.S. Navy UC-35C/D aircraft. Work will be performed at Andrews Air Force Base, Clinton, Md. (25 percent); Marine Corps Air Station (MCAS), Futenma, Japan (25 percent); Naval Air Station, New Orleans, La. (17 percent); MCAS Miramar, Calif. (17 percent); and MCAS Cherry Point, N.C. (16 percent). Work is expected to be completed in November 2010. Contract funds in the amount of $5,415,627 will expire at the end of the current fiscal year. This contract was not competitively procured pursuant to FAR 6.302-1. The Naval Air Systems Command, Patuxent River, Md., is the contracting activity (N00019-10-C-0027). AIR FORCE ~Northrop Grumman Information Technology, McLean, Va., was awarded a $46,422,033 contract which will provide for reliability and maintainability information system sustainment and modification which will include all activities associated with planning, controlling, documenting, maintaining and operating the system. At this time, $2,500,000 has been obligated. 554 ELSG/PK, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8770-10-D-0001). ~Boeing Co., Wichita, Kan., was awarded a $35,403,359 contract which will provide contractor logistics support for the VC-25A aircraft. At this time, $8,220,600 has been obligated. 727 ACSG/PKB, Tinker Air Force Base, Okla.,is the contracting activity (FA8106-09-C-0005/P00005). ~Northrop Grumman System Corp., San Diego, Calif., was awarded a $22,549,365 contract which will develop and deliver a new synthetic aperture radar mode for the Block 20/30 Enhanced Integrated Sensor Suite. At this time, $2,068,897 has been obligated. 303 AESG/SYK, Wright-Patterson Air Force Base, Ohio, is the contracting activity (F33657-01-C-4600, P00331). DEFENSE LOGISTICS AGENCY ~CORRECTION: The announcement dated Jan. 26, 2010, for Metals USA, (DBA) 1-Solutions Group, Fort Washington, Pa., should have stated that the contract is for customer direct metals deliveries (SPM8EG-09-D-0013).

No comments:

Post a Comment