Conducted using the first of five tankers on order for the Royal Australian Air Force, the milestone follows other recent firsts with "wet" and night-time contacts involving the type. The modified airliner is equipped with a tail refuelling boom and two Cobham 905E under-wing hose-and-drogue pods.
Airbus Military says the tanker performed a 2h sortie from its Getafe site near Madrid, in the course of which the fighters - which were deployed from Torejon air base - made 13 contacts, including 11 simultaneously.
A total of 11.4t of fuel was transferred at an altitude of around 15,000ft (4,570m) and a speed of 250kt (460km/h), it says. This represents roughly half of the total volume so far delivered during flight testing of the A330 MRTT.
The RAAF will take delivery of its first KC-30 tanker by mid-2010, according to Airbus Military. The company also has orders to provide A330-based tankers to Saudi Arabia (six), the United Arab Emirates (three) and the UK (14).
Wednesday, November 25, 2009
DTN News: Airbus A330 Tanker Refuels Two Aircraft For The First Time
DTN News: Airbus A330 Tanker Refuels Two Aircraft For The First Time
*Source: DTN News / Defense Media
(NSI News Source Info) PARIS, France - November 26, 2009: Airbus Military's A330-based multi-role tanker/transport (MRTT) has for the first time conducted the simultaneous in-flight refuelling of two aircraft, by hooking up with a pair of Spanish air force Boeing EF-18A fighters.
Conducted using the first of five tankers on order for the Royal Australian Air Force, the milestone follows other recent firsts with "wet" and night-time contacts involving the type. The modified airliner is equipped with a tail refuelling boom and two Cobham 905E under-wing hose-and-drogue pods.
Airbus Military says the tanker performed a 2h sortie from its Getafe site near Madrid, in the course of which the fighters - which were deployed from Torejon air base - made 13 contacts, including 11 simultaneously.
A total of 11.4t of fuel was transferred at an altitude of around 15,000ft (4,570m) and a speed of 250kt (460km/h), it says. This represents roughly half of the total volume so far delivered during flight testing of the A330 MRTT.
The RAAF will take delivery of its first KC-30 tanker by mid-2010, according to Airbus Military. The company also has orders to provide A330-based tankers to Saudi Arabia (six), the United Arab Emirates (three) and the UK (14).
Conducted using the first of five tankers on order for the Royal Australian Air Force, the milestone follows other recent firsts with "wet" and night-time contacts involving the type. The modified airliner is equipped with a tail refuelling boom and two Cobham 905E under-wing hose-and-drogue pods.
Airbus Military says the tanker performed a 2h sortie from its Getafe site near Madrid, in the course of which the fighters - which were deployed from Torejon air base - made 13 contacts, including 11 simultaneously.
A total of 11.4t of fuel was transferred at an altitude of around 15,000ft (4,570m) and a speed of 250kt (460km/h), it says. This represents roughly half of the total volume so far delivered during flight testing of the A330 MRTT.
The RAAF will take delivery of its first KC-30 tanker by mid-2010, according to Airbus Military. The company also has orders to provide A330-based tankers to Saudi Arabia (six), the United Arab Emirates (three) and the UK (14).
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment