Showing posts with label C-27J Light Transport Aircraft. Show all posts
Showing posts with label C-27J Light Transport Aircraft. Show all posts

Tuesday, May 22, 2012

DTN News - CHINESE COUNTERFEIT PRODUCTS: China Fake Parts 'Used In US Military Equipment'

DTN News - CHINESE COUNTERFEIT PRODUCTS: China Fake Parts 'Used In US Military Equipment'
Source: DTN News - - This article compiled by Roger Smith from reliable sources BBC World News
(NSI News Source Info) TORONTO, Canada - May 22, 2012: Vast numbers of counterfeit Chinese electronic parts are being used in US military equipment, a key Senate committee has reported.

A year-long probe found 1,800 cases of fake parts in US military aircraft, the Senate Armed Services Committee said.
More than 70% of an estimated one million suspect parts were traced back to China, the report said.
It blamed weaknesses in the US supply chain, and China's failure to curb the counterfeit market.
The failure of a key part could pose safety and national security risks and lead to higher costs for the Pentagon, the committee said.
US servicemen rely on a variety of "small, incredibly sophisticated electronic components" found in night vision systems, radios and GPS devices and the failure of a single part could put a soldier at risk, the report said.
It highlighted suspect counterfeit parts in SH-60B helicopters used by the Navy, in C-130J and C-27J cargo planes and in the Navy's P-8A Poseidon plane.
After China, the UK and Canada were found to be the next-largest source countries for fake parts.
'Avoiding scrutiny'
The committee criticised China for failing to shut down counterfeit manufacturers and said that committee staff wanting to travel to China for the investigation had not been granted visas.
"Counterfeit electronic parts are sold openly in public markets in China," the report said.
"Rather than acknowledging the problem and moving aggressively to shut down counterfeiters, the Chinese government has tried to avoid scrutiny," it added.
But the report said that use of Department of Defense programmes such as the Government-Industry Data Exchange Program (GIDEP), designed to log suspected fake parts, were "woefully lacking".
Between 2009 and 2010 the GIDEP only received 217 reports relating to suspected fake counterfeit components, the majority of which were filed by just six companies, it said. Only 13 reports came from government agencies.
The report also said that in some cases the US defence department had reimbursed contractors for the costs they incurred as a result of their failure to spot fake components in their own supply chain - giving companies no incentive to weed out counterfeits themselves.
But it praised the National Defense Authorization Act, signed into law on 31 December 2011 by President Barack Obama, which aims to stop counterfeit parts from entering the country and would cut down on sourcing components from unknown suppliers.
The report's focus on China comes as the US is beginning the task of "pivoting" its defence strategy towards the Asia-Pacific region.
The Pentagon is also preparing to absorb about $450bn (£285bn) of cuts over the next decade.
But it could face cutbacks of a further $500bn if mandatory across-the-board spending cuts come into effect at the end of 2012, after Congress failed to reach a deficit reduction plan last year.

*Link for This article compiled by Roger Smith from reliable sources BBC World News
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS

Wednesday, February 23, 2011

DTN News - AFGHAN WAR: Afghan Air Force Develops Loadmasters as C-27 Fleet Expands

DTN News - AFGHAN WAR: Afghan Air Force Develops Loadmasters as C-27 Fleet Expands
(NSI News Source Info) KABUL, Afghanistan - February 23, 2011: As the Afghan Air Force C-27A Spartan fleet grows, now half way to its goal of twenty, so does the need for qualified loadmasters.

Responsible for the cargo, personnel and safety of the aircraft, the loadmaster backs up the pilot on everything behind the flight deck, contributing to the full-crew concept of flight operations and setting the stage for mission accomplishment. “While pilots fly the aircraft, the loadmasters fulfill the C-27s function as an air-mobility mover,” said U.S. Air Force Master Sgt. Chris Neufeld, a NATO C-27 loadmaster advisor. Because of the importance of loadmasters to mission success, Neufeld and other advisors work hard to develop the Afghan Air Force loadmaster corps at the Afghan Air Force Base here through classroom training and practical exercises. Beneficial as class-work and practice can be, Neufeld believes there is no greater training platform than performing the job of a loadmaster in a real-world scenario. “They are coming along great,” Neufeld said. “All of the responsibilities a C-27 loadmaster has is a lot to ask for from any professional. The progress and dedication of the Afghan airmen is incredible.” “We are learning how to be proper loadmasters to improve our career field and serve our country,” Khan said. “We are going to take what we learn and teach it to others who come after us. Right now, we are learning all that we can from our instructors so that in the future we can have Afghans teaching Afghans and help the Afghan Air Force become an independent force.” Gukbahar feels qualified loadmasters capable of bringing the C-27 to its full mission potential provide his country and its people with a sense of protection. “An army without a proper air force looks weak, and you need skilled professionals to make a proper air force. The air force not only helps project power, but also provides security to the people with its ability to reach anyone in the country and provide them with support,” he said.

*Speaking Image - Creation of DTN News ~ Defense Technology News
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News

© COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS

Wednesday, October 28, 2009

DTN News: Alenia Wins Training Contract for Afghanistan National Army Air Corps (ANAAC) G-222s (C-27J)

DTN News: Alenia Wins Training Contract for Afghanistan National Army Air Corps (ANAAC) G-222s (C-27J) *Source: DTN News / Int'l Media (NSI News Source Info) ROME, Italy - October 29, 2009: Alenia North America, a unit of Italy's Finmeccanica, has been awarded a $7 million contract to provide G-222 aircrew and maintenance training to the U.S. Air Force, the company said Oct. 27. Alenia Aeronautica, through its American subsidiary Alenia North America, will provide the Combined Security Transition Command in Afghanistan with eighteen refurbished G.222 medium tactical transport aircraft. These will be transferred by the United States Air Force’s Combined Air Power Transition Force in Kabul to the Afghanistan National Army Air Corps (ANAAC). Initial aircraft delivery will occur in 2009 and deliveries will continue through 2011. Alenia North America as prime contractor is responsible for programme management, while Alenia Aeronautica will refurbish the aircraft in Naples, Italy. Logistical support in Afghanistan will be carried out by L-3 Vertex, an American company. A modified version of the G.222 known as the C-27A was operated by the USAF during the 1990s and continues to be operated by the U.S. Government while the G.222 is still in service with air forces around the world. The G.222 configuration proposed for the G.222-ANAAC programme is a derivative of the G.222 Italian Military Certified Aircraft (G.222 TCM). Eighteen ex-Italian Air Force G.222 will be refurbished with updated avionics and general system improvements to provide each aircraft with the capability to perform the tactical airlift roles prescribed by the USAF. Two aircraft, in VIP configuration, will support the Afghan government airlift requirements. The training will be provided to U.S. advisors who are set to work with the Afghanistan National Army Air Corps (ANAAC), which is acquiring 18 G-222 transport aircraft from the U.S. The aircraft, which formerly flew with the Italian Air Force, were resold to the U.S. by Alenia. The training program, which covers pilots, loadmasters, crew chiefs, and maintenance personnel, will last between 15 and 40 days and will involve classroom and flight training at Alenia's facility in Capodichino, Italy. Alenia was contracted in 2008 by the USAF in a $287 million deal to supply the aircraft. The first two aircraft have now been delivered to the USAF and deliveries will continue into 2011. The G-222 aircraft, which were built between 1977 and 1985, are receiving avionics upgrades, while two will also be given sound-proof, VIP transport modules.

Friday, April 03, 2009

Alenia Talks With Northrop About C-27J Role

Alenia Talks With Northrop About C-27J Role
(NSI News Source Info) April 3, 2009: Italy's Alenia Aeronautica and Northrop Grumman are discussing a possible role for the American giant on the $2 billion program to furnish the U.S. Army and Air Force with C-27J tactical transports, according to sources at the two companies. The C-27J has a 35% increase in range and a 30% increase in service ceiling over the original G.222. The Italian Air Force, Hellenic Air Force, Bulgarian Air Force, Romanian Air Force, United States Army and the United States Air Force have ordered the C-27J. Alenia is offering Canada the C-27J as a CC-115 Buffalo replacement. Lithuania ordered the C-27J as Antonov An-26 replacement. The GMAS team promoted the C-27J in the U.S. Army and Air Force's Joint Cargo Aircraft competition against Raytheon and EADS North America's C-295. Both the U.S. Army and Air Force JCA orders combined are expected to top 100 aircraft. The JCA will eventually replace the existing C-23 Sherpa, C-12 Huron and C-26 Metroliners. The C-27J had completed the U.S. Department of Defense's Early User Survey evaluations by November 2006, flying 26 hours and surpassing all the JCA program requirements. The GMAS team also announced that the C-27J will be assembled at a facility at Cecil Field, Duval County, Florida. While the final selection of the JCA was expected to be announced in March 2007, the decision came on 13 June 2007, when the Pentagon selected the C-27J as its Joint Cargo Aircraft. A contract worth US$2.04 billion was awarded to the L-3 Communications team for 78 C-27Js along with training and support on 13 June 2007. On 22 June 2007, Raytheon formally protested the award of the JCA contract to the Alenia C-27J. On 27 September 2007, the GAO announced that it had denied Raytheon’s protest, thereby allowing the Pentagon to go ahead with the C-27J procurement. Prior to Raytheon's protest, the first C-27J aircraft were to begin delivery to the joint U.S. Army-Air Force test and training program in June 2008. The first flight of a US C-27J occurred on 17 June 2008. The C-27J was being considered as a sole-source contract by the Government of Canada as a future replacement for its current search and rescue airfleet, the contract being worth approximately C$3 billion as of January 2007. Romania ordered seven C-27Js for delivery from 2008 to replace Antonov An-24 and An-26 aircraft, beating the EADS CASA C-295. However, the order was blocked by the government in February 2007 upon a legal challenge filed by EADS. In June 2007, the order was confirmed again when the Romanian court rejected EADS' complaint. The Romanian government officially signed a contract for the delivery of seven C-27Js on 7 December 2007. The C-27J is a probable contender for a Royal Australian Air Force requirement for light airlifer to replace its aging DHC-4 Caribou. Currently orders stand at Italy (12), Greece (12 + 3 options), Bulgaria (5), Lithuania (3), Morocco (4), Romania (7), and United States (78). The US Air Force is shifting US$32 million from the Pentagon's 2008 budget to purchase a C-27J for its Special Operations Command. The AC-27J will be equipped using proven hardware and systems to reduce risk. Alenia is partnered with L-3 Communications which is serving as the U.S. prime contractor on the effort to supply 78 of the aircraft to the Pentagon. Two have already been delivered. It remains unclear whether Northrop would step into the role vacated by Boeing, which pulled out of the C-27J program in February after more than two years of difficult negotiations with Alenia, largely over investment levels. Alenia executives have repeatedly said that the company alone - or working with other arms of its giant parent Finmeccanica - could easily handle U.S. production of the aircraft even without another American partner. Boeing was to serve as co-manager of Alenia's planned assembly line in Florida, ensuring a major U.S. platform provider was on board the C-27J program. Northrop could work with Alenia on final assembly of aircraft at a new factory in Jacksonville, Fla., which Alenia plans to build. Even before Boeing pulled out of talks earlier this year, Alenia said it would start building the U.S. assembly facility on its own to ensure it wouldn't miss its delivery deadlines. Alenia will break ground April 25 to have the line operational by April 2010. In the meantime, the first 13 planes are being delivered from Alenia's production line near Turin, Italy. Northrop and Alenia declined to comment.

Friday, March 20, 2009

Alenia's C-27J Spartan Favored Over Airbus Military's C-295 For Canadian Air Force / Canadian DM To Seek SAR Approval

Alenia's C-27J Spartan Favored Over Airbus Military's C-295 For Canadian Air Force / Canadian DM To Seek SAR Approval
(NSI News Source Info) VICTORIA, British Columbia - March 20, 2009: Canadian Defence Minister Peter MacKay is planning to go to the Cabinet of Prime Minister Stephen Harper in the next several months for approval of a multibillion-dollar project to purchase up to 17 search-and-rescue aircraft. The Aeritalia G.222 is a medium-sized STOL military transport aircraft. It was originally developed to meet a NATO specification, but Italy was initially the only NATO member to adopt the type. The United States purchased a small number of G.222s, designating them the C-27A Spartan. The C-27J Spartan is a more modern development with the engines and systems of the C-130J Super Hercules. But defense industry sources say his department is facing an uphill battle with other federal government bureaucrats who oppose what they see as a plan to hand the 3.1 billion Canadian dollar ($2.5 billion) acquisition to Alenia North America. Alenia is offering the C-27J aircraft. That potential sole-source procurement prompted protests in December and January from Airbus Military, which offers the C-295 aircraft. And Viking Air, based here, launched a lobbying campaign, writing members of Parliament to ask why the Defence Department wanted a U.S.-built aircraft when a Canadian-made plane was available. Viking Air has proposed that it provide new DHC-5 Buffalo aircraft built here and in Calgary, Alberta. The Buffalo is flown by the Canadian Forces on fixed-wing search-and-rescue missions. The Defence Department has also faced increasing opposition from Industry Canada, another federal department that buys goods. There is concern that the specifications for the new aircraft favor the C-27J. Over the years, Air Force officers have never hidden their preference for that plane. Industry sources said Industry Canada wants an open and fair competition to ensure that Canadian firms get maximum benefits from the project. During a tour of the naval base here, MacKay said the specifications for the new aircraft have already been worked out but that no plane is favored. He said his Defence Department officials are working closely with Industry Canada representatives. "I suspect it will be a full, open and transparent process and one that will hopefully invite bidders in the very near future," he said. "I want to take something to Cabinet this spring, but I'm going to have to get the cooperation of the other departments to ensure we're ready to proceed." The SAR procurement and budget includes a 20-year support contract. Martin Sefzig, director of Canadian programs for Airbus Military, said the company welcomes the chance to bid and plans to stress the C-295's low maintenance cost, its suitability for search and rescue, and the various search-and-rescue sensors it can carry. Viking Air President David Curtis noted that the requirement to replace the present search-and-rescue fleet is not based on a lack of ability of the Buffalo to do the job, but is due to the aging of the aircraft, which are about 40 years old. Curtis argues that buying Buffalos would also save money that could be used to buy Dash 8 aircraft from Bombardier of Montreal for search-and-rescue operations on the country's east coast. The Buffalos currently operate on the west coast because of their maneuverability in the mountains. Both procurements would create large numbers of Canadian jobs at a time when the country's aerospace industries are hurting, according to Viking Air officials. The firm believes that restarting the Buffalo production line also could attract potential export orders from other nations interested in the plane. In a statement, Alenia North America said it would present its C-27J proposal to the Canadian government. If accepted, Canadian aerospace firms could be brought in as potential suppliers on the U.S. military's Joint Cargo Aircraft program, which will also employ the C-27J. In early 2008, the Canadian Forces announced it would fly its Buffalos until 2014 or 2015. But in December, MacKay said he was going to try to fast-track the fixed-wing search-and-rescue project since it was important to the military's domestic operations. Airbus Military's C-295 and Alenia's C-27J Spartan have over the years been seen as the main contenders for the program. In April 2004, Airbus officials complained publicly that the Canadian Air Force was pushing for a sole-source purchase of the C-27J. Alan Williams, the Defence Department's former assistant deputy minister for materiel, later testified before a parliamentary committee that the Air Force had designed the requirements for the search-and-rescue aircraft program to favor the C-27J. But the ongoing delays in the project have allowed Viking Air to enter the competition. Viking Air recently restarted a production line for Twin Otter aircraft and received an order for those planes from the U.S. Army.

Monday, March 16, 2009

Colombia Wants To Join Embraer KC-390 Program / Colombia Wants Partnership With Brazil And Participation In Embraer Airlifter

Colombia Wants To Join Embraer KC-390 Program / Colombia Wants Partnership With Brazil And Participation In Embraer Airlifter (NSI News Source Info) BRASILIA - March 16, 2009: The minister of defense of Colombia, Juan Manoel Saints, was hosted here on Wednesday March 11 by the Minister of Defense, Nelson Jobim, and revealed his interest in a strategic partnership between the two countries. Embraer C-390 is a medium-sized twin-engined jet-powered military transport aircraft proposed by the Brazilian aircraft manufacturer Embraer. It will be the heaviest aircraft that the company has made so far, and will be able to transport up to 19 tons of cargo, including wheeled armored vehicles. Size-wise it is an aircraft between the twin-turboprop C-27J Spartan, with an 11.5 ton payload and the C-130J Hercules with a 21.7 ton payload. The aircraft will incorporate many of the technological solutions from the Embraer E-Jets series. The aircraft will have a rear ramp for loading and unloading a wide range of cargo. The unit price is estimated to be around $50 million US, while the competition sells similar models for up to $120 million. The vice president of Embraer, Luís Carlos Aguilar, said that according to their estimates, some 695 military transport aircraft in the world will need to be replaced during the next decade, and that there is potential market for this kind of plane. Potential power plant options have been studied in the 17,000–22,000lb-thrust (75.6–98kN) range, including engines such as Pratt & Whitney's PW6000 and Rolls-Royce's BR715. The Brazilian postal service, the Correios, has demonstrated interest in buying at least 5 and eventually 20 to 25 of the aircraft, in lieu of using commercial freight service for mail transport. In May, 2008, the Brazilian Congress released 800 million Reais (US$ 470 million) to be invested in the project and development of the aircraft. The media also claimed that this aircraft is not only going to be used by the Brazilian Air Force, but also for Brazilian Army and Brazilian Navy, but still not confirmed for government agencies. Early March of 2008: Brazilian Government is going to invest about R$60 mn(or US$30 mn) to inicial development of the aircraft. At the same time, the Brazilian Air Force is finalizing the purchase contract that problably will buy 22 to 30 aircrafts for the inicial lot. Embraer is talking with the possible partners.
Colombia wants to strengthen cooperation for monitoring its common border. It also wants to establish partnerships with Brazil in defense research and technology, and also wants to participate in the program to develop the Embraer KC-390 military transport aircraft.
“Brazil is our strategic partner and we want to establish closer links and cooperation,” Saints said.
Saints and his delegation, comprising the commanders of the three Colombian armed forces, heard Jobim present Brazil’s new National Defense Strategy, launched in December 2008. The minister-head of the Secretariat of Strategical Subjects, Mangabeira Unger, complemented the communication. The National Strategy of Defense, according to Jobim, has as objective to reorganize the Armed Forces, to strengthen the national defense industrial base, and to improve military service.
“These three objectives are interlinked. It is not possible to think of the Armed Forces that are not tied to development, or of development that is not linked to the Armed Forces”, said Jobim. Nelson Jobim also said that the visit by his Colombian counterpart will provide advances in some areas of bilateral cooperation…..such as improving control of the airspace between the two countries, along a 50-kilometer band on both the sides of the border.
Juan Manoel Saints said that all the countries in the region must find alliances in strategic areas as, for example, in the military industry and for professional qualification. He cited the cases of the Super Tucano aircraft bought by Colombia from the Brazilian company Embraer, saying “we are very happy with Brazilian aircraft.”
The Colombian minister did not exclude the possibility of establishing, within the framework of these bilateral relations, a strategic alliance of the two countries’ defense industries.
In this perspective, Juan Manoel Saints said, one idea is to see how Colombia can participate in the production of the Embraer transport aircraft that Brazil intends to develop. “Anything that we can do in this respect with Brazil will be very positive, as the airplanes that we have bought from Brazil are very good,” he said.
Juan Manoel Saints said that, for Colombia, the relation with Brazil is of strategic convenience over the long term. “Therefore, everything that we can do to develop and reinforce this relationship is a very important decision,” he added.
According to Saints, bilateral cooperation could also include control of airspace, joint satellite programs, and border monitoring.

Saturday, March 14, 2009

A400M Customers Push Off Go/No-Go Decision

A400M Customers Push Off Go/No-Go Decision
(NSI News Source Info) PARIS - March 14, 2009: Defense ministers of the seven European launch countries for the A400M have agreed to a three-month suspension of a contract clause that allows them to cancel the airlifter program. The move allows time to adopt a common position in negotiations with industry, French Defense Ministry spokesman Laurent Teisseire said March 13. France asked for the contract "moratorium" at a March 12 confab on the margins of an informal EU defense ministers meeting in Prague, Teisseire said. "We are pushing back a contract rendezvous point," he said. The A400M contract allows OCCAR, the arms procurement agency that manages the program, to cancel the program - or individual aircraft - because no first flight occurred within 14 months of the contracted date, Teisseire said. The deadline for OCCAR to decide to cancel is April 1, EADS Chief Executive Louis Gallois told a March 10 press conference. The moratorium bars the agency from canceling the program in the next three months, but maintains the right to kill it after that period ends. EADS, A400M's lead builder, said it is unlikely the program will be axed. Company officials want to renegotiate the contract to cover revised plans for production ramp-up, penalties, the aircraft standard that is acceptable for delivery, and other contract clauses. The current agreement allows six months between delivery of initial and full operational capability. EADS wants to extend that time, noting that full capability depends on the availability of software from suppliers. If OCCAR cancels the program, EADS would refund 5.7 billion euros ($7.3 billion) made as predelivery payments, EADS officials said in a statement about the company's 2008 results. The March 12 meeting also was attended by Turkey, which is not an EU member but is an A400M launch customer, along with Britain, Belgium, Luxembourg, France, Germany and Spain. The meeting took place in Prague because the Czech Republic holds the six-month rotating EU presidency. Air Force Gen. Vincenzo Camporini, the Italian military's chief of staff, said March 12 that Italy made a "wise" decision in 2001 to opt out of the A400M program during prelaunch negotiations, despite criticism at the time.

Friday, March 13, 2009

Italy's Military Chief: It's Wise To Be Out Of A400M

Italy's Military Chief: It's Wise To Be Out Of A400M
(NSI News Source Info) ROME - March 13, 2009: As delays continue to plague the development of the A400M European transport aircraft, Italy's senior military commander has said Italy did the "wise" thing in steering clear of the program at the beginning of the decade. On 9 January 2009, EADS announced that the first delivery has been postponed until at least 2012. EADS also indicated that it wants to renegotiate 'certain technical characteristics' of the aircraft. EADS has long maintained the first deliveries would begin three years after the A400M's first flight. The German newspaper Financial Times Deutschland has closely followed the A400M program and reported on 12 January 2009 that the aircraft is overweight by 12 tons and may not be able to achieve a critical performance requirement, the ability to airlift 32 tons. Sources told FTD that, currently, the aircraft can only lift 29 tons, which is insufficient to carry a modern armored infantry fighting vehicle. The FTD report prompted the chief of the German Air Force to say, "That is a disastrous development," and could delay deliveries to the Luftwaffe until 2014. The Initial Operational Capability (IOC) for the Luftwaffe is delayed at least until 2017. This leads the political planning to potential alternatives in the shape of a higher integration of European airlift capabilities. The OCCAR reminded the participating countries that they can terminate the contract before 31 March 2009. "I am convinced of this. Italy was strongly criticized when it made this decision. Today, those critics should indulge in some self-criticism," Gen. Vincenzo Camporini, Italian chief of staff, said March 12, when he was asked whether Italy had made the right decision to opt out of the group of European nations that was planning the airlifter in 2001. Camporini said he was nevertheless perturbed by the technical problems that have pushed back delivery dates for the aircraft. "As a passionate supporter of European capacity, I am seriously concerned about the news arriving from industry about the program," he said. "I hope that difficulties are overcome, because that way the European Union can finally carry out its strategic capacity." But Camporini said that Italy was vindicated in its decision not to sign up. "It is worth underlining the wise decision taken by political and military planners at the start of the decade, knowing the theoretical difficulties of the program, to opt for a solution that provides possibly a reduced capacity but gives Italy today a capacity for transport air that is modern, adequate and among the best in Europe." Italy operates the C-130J and the C-27J tactical transport, charters civilian aircraft, and is expecting delivery of 767 tanker transports.

Friday, January 16, 2009

Slovakia Air Force Selected Light Transport Aircraft C-27J: Report / Slovakia Chooses Alenia’s C-27J Light Transport Aircraft

Slovakia Air Force Selected Light Transport Aircraft C-27J: Report / Slovakia Chooses Alenia’s C-27J Light Transport Aircraft
(NSI News Source Info) January 17, 2009: Around the world, buyers of light military transport aircraft face 3 main choices: Alenia’s C-27J Spartan, EADS-CASA’s C-295M, or Russia’s AN-32. EADS-CASA began with notable leads in orders and customers over its C-27J rival. Spain, Algeria, Brazil, Finland, Jordan, Poland, and Portugal picked the C-295M, which offers better range, more cost-efficient operation, and more standard cargo pallets in its longer fuselage.
The Alenia C-27J Spartan is a medium-sized military transport aircraft. The C-27J is an advanced derivative of the company's G.222 (C-27A Spartan in US service), with the engines and systems of the Lockheed Martin C-130J Super Hercules. The aircraft was selected as the Joint Cargo Aircraft for the United States military.
Then the USA’s Joint Cargo Aircraft program made Alenia a winner, and will order at least 78 C-27Js. That tipped the production balance, and appears to be adjusting decision calculations as well. The C-27J’s customers now include Italy, Bulgaria, Greece, Lithuania, Morocco, Romania, and the USA. Its larger fuselage diameter and reinforced floor let it carry tactical loads like vehicles and small helicopters as well as pallets, and its design gives it both a higher top speed and commonalities with the global C-130J Hercules medium transport fleet. If US Special Operations Command has its way, an AC-27J “Baby Spooky” gunship variant may be next. Slovakia has now become the latest country to opt for the C-27J, beating rumored offers from EADS-CASA (C-295M) and Lockheed Martin (C-130J). Alenia was named as the preferred bidder in late December 2008, and negotiations will now focus on Slovakia’s 100% requirement for industrial investment offsets. Alenia’s key partners Rolls Royce (engines) and the Czech Republic’s Aero Vodochody (center wing boxes) are also likely to be involved in these discussions. The order is unlikely to be large, as the country has just 2 AN-26 and 1 AN-24 aircraft to replace. Another AN-24 was lost over Hungary in January 2006 when it crashed while returning from Kosovo, killing all 42 soldiers on board. Previous approval discussions for the Slovakian program focused on figures of about $112 million equivalent, which would suffice for 2-3 aircraft plus the usual spares, training, and other costs associated with a new aircraft type.