Thursday, May 27, 2010
DTN News: U.S. Department of Defense Contracts Dated May 27, 2010
DTN News: U.S. Department of Defense Contracts Dated May 27, 2010
Source: U.S. DoD issued May 27, 2010
(NSI News Source Info) WASHINGTON - May 28, 2010: U.S. Department of Defense, Office of the Assistant Secretary of Defense (Public Affairs) Contracts issued May 27, 2010 are undermentioned;<>
CONTRACTS
DEFENSE LOGISTICS AGENCY
~Sterlingwear of Boston, Inc.*, Boston, Mass. is being awarded a maximum $36,700,000 firm-fixed-price, total set-aside, indefinite-delivery/indefinite-quantity contract for men’s and women’s overcoats. There are no other locations of performance. Using service is Air Force. The original proposal was Web solicited with five responses. The date of performance completion is Nov. 27, 2011. The Defense Supply Center Philadelphia, Philadelphia, Pa., is the contracting activity (SPM1C1-10-D-1077).
~Aviall Services, Dallas, Texas, is being awarded a maximum $17,325,000 firm-fixed-price, sole-source contract for helicopter engine parts. There are no other locations of performance. Using service is Army. There was one proposal originally solicited with one response. The date of performance completion is May 30, 2013. The Defense Logistics Agency Philadelphia (DSCR-AHB), Redstone Arsenal, Ala., is the contracting activity (SPRRA1-10-D-0015).
AIR FORCE
~Alion Science and Technology Corp., Chicago, Ill., was awarded a $24,761,763 contract which will provide for research development for Air Force Research Laboratory for critical live, virtual and constructive environments. At this time, $99,206 has been obligated. 55 CONS/LGCD, Offutt Air Force Base, Neb., is the contracting activity (N61339-03-D-0300, Delivery Order 0246).
~Alion Science and Technology Corp., Chicago, Ill., was awarded a $24,251,273 contract which will provide research and engineering integration of Department of Defense manned and unmanned ground vehicle systems. At this time, $4,405,506 has been obligated. 55 CONS/LGCD, Offutt Air Force Base, Neb., is the contracting activity (N61339-03-D-0300, Delivery Order 0248).
~Wyle Laboratories, Huntsville, Ala., was awarded a $23,809,521 contract which will conduct engineering, analysis and testing tasks to facilitate a reliability improvement, parts obsolescence problems, and identify corrective actions that can be taken to eliminate or control problems. At this time, $125,984 has been obligated. 55 CONS/LGCD, Offutt Air Force Base, Neb., is the contracting activity (HC1047-05-D-4005).
~Booz Allen & Hamilton, Inc., Herndon, Va., was awarded a $12,321,308 contract which will provide Joint Program Analysis and Integration Office survivability/vulnerability scientific and technical analysis. At this time, $3,214,286 has been obligated. 55 CONS/LGCD, Offutt Air Force Base, Neb., is the contracting activity (SP0700-03-D-1380).
~Booz Allen & Hamilton, Inc., Herndon, Va., was awarded an $11,904,222 contract which will provide survivability/vulnerability analysis and assessment. At this time, $347,222 has been obligated. 55 CONS/LGCD, Offutt Air Force Base, Neb., is the contracting activity (SP0700-98-D-4002, Delivery Order 0410).
~Raytheon Co., Intelligence and Information Systems, Reston, Va., was awarded an $11,350,052 contract which will provide Transportable Ground Receive Suite terminals. At this time, no funds have been obligated. 653 ELSG/KCK, Hanscom Air Force Base, Mass., is the contracting activity (FA8628-06-C-2066 P00072).
~L-3 Services, Inc., Herndon, Va., was awarded a $6,050,543 contract which will provide intelligence analysis; operations and planning; targeting; collection management; support analysis and production support; and information systems sustainment support in the U.S. European Command area of responsibility. At this time, the entire amount has been obligated. 700 CONS/LGCD, Kapaun Air Station, Germany, is the contracting activity (FA5613-09-D-5000-0016).
NAVY
~TolTest, Inc., Maumee, Ohio, is being awarded $8,644,201 for firm-fixed-price task order #0005 under a multiple-award construction contract (N69450-08-D-1283) for design and construction to replace a JP-5 fuel storage tank at U.S. Naval Base Guantanamo Bay. The proposed work includes replacement of the fuel storage tank, backup diesel generator, tank stilling wells, and paved dike access road. Work will be performed in Guantanamo Bay, Cuba, and is expected to be completed by November 2011. Contract funds will not expire at the end of the current fiscal year. Three proposals were received for this task order. The Naval Facilities Engineering Command, Southeast, Jacksonville, Fla., is the contracting activity.
~L-3 Communications Corp., Arlington, Texas, is being awarded a $10,686,851 firm-fixed-price modification to a previously awarded indefinite-delivery/indefinite-quantity contract (N00019-04-D-0110) for additional logistics support services for the Navy’s C-40A aircraft fleet. Services to be provided include site activation; site support at Naval Air Station (NAS) Fort Worth Joint Reserve Base, Fort Worth, Texas, NAS Jacksonville, Fla., and NAS North Island, Calif.; inventory management and support, to include tracking and control of government- and contractor-owned inventory; depot-level support, scheduled and unscheduled; drop-in maintenance; component repair and overhaul of government- and contractor-owned inventory; replacement of government- and contractor-owned inventory; contractor field teams; and engine condition monitoring. Work will be performed in Fort Worth, Texas (22 percent); NAS Jacksonville, Fla. (22 percent); NAS North Island, Calif. (22 percent); Oklahoma City, Okla. (20 percent); Arlington, Texas (8 percent); and Tulsa, Okla. (6 percent). Work is expected to be completed in November 2010. The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.
~Sikorsky Aircraft Corp., Stratford, Conn., is being awarded a $7,079,047 firm-fixed-price modification to a previously awarded indefinite-delivery/indefinite-quantity contract (N00019-07-D-0004) to exercise an option for the VH-60N executive helicopter special progressive aircraft rework induction. Work will be performed in Stratford, Conn., and is expected to be completed in September 2011. Contract funds in the amount of $7,079,047 will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.
~The Boeing Co., St. Louis, Mo., is being awarded a $6,376,999 firm-fixed-price delivery order against a previously issued basic ordering agreement (N00019-05-G-0026) for the procurement of 144 kits in support of engineering change proposal #6282, “Fatigue Test Article 50/Fatigue Test Article 77 Post-Cost Reduction Initiative Inner Wing Retrofit Out of Warranty Kits,” for the F/A-18E/F aircraft. Work will be performed in St. Louis, Mo., and is expected to be completed in January 2015. Contract funds will not expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment