Showing posts with label British Army. Show all posts
Showing posts with label British Army. Show all posts

Saturday, June 08, 2013

DTN News - UK DEFENSE NEWS: Recruiting Former Gurkhas Into The Army Reserves Is A No-Brainer

DTN News - UK DEFENSE NEWS: Recruiting Former Gurkhas Into The Army Reserves Is A No-Brainer
Source: DTN News - - This article compiled by Roger Smith from reliable sources Nick Harvey
(NSI News Source Info) TORONTO, Canada - June 8, 2013: Gurkhas are a widely admired, loved and revered part of the British Army. But strangely, five years after allowing them to settle here after completing their service, we still don't routinely recruit them to the reserves when they leave, despite their desire to continue to serve. At the same time, there are serious concerns about whether we can meet the ambitious new targets as part of the Army 2020 vision and restructure in which the reserves will play a vital role. It seems a no-brainer that we should retain some of the toughest and bravest fighters we have, and instead help them lead the way for the future reserves.

The 2010 defence review, which I was involved in as a minister, triggered a mass restructure of our Armed Forces. What we have now is an ambitious plan for a future Army that relies in part on a highly-trained and deployable reserve force. In practice, it means that we need to double the number of trained and ready reserves from what we currently have in the Territorial Army.
The 2010 defence review, which I was involved in as a minister, triggered a mass restructure of our Armed Forces. What we have now is an ambitious plan for a future Army that relies in part on a highly-trained and deployable reserve force. In practice, it means that we need to double the number of trained and ready reserves from what we currently have in the Territorial Army.
A huge recruitment drive and massive rejuvenation of the reserve forces will be far from easy. We’re already lagging behind: we will need a serious culture change within the Ministry of Defence and the Army of how we view the reserves if we’re achieve our targets. Currently, public concerns persist that reserves are simply "making up numbers" after troop redundancies, that they are just an add-on to the "real" Army. Countering such perceptions is essential and the Gurkhas can lead the way. That is why I am asking that we begin signing up our former Gurkha soldiers as part of the culture shift towards a battle-ready, fully integrated reserve force rather than losing them completely as we currently do.
Gurkhas have been an integral part of the British Army for almost 200 years, characteristically loyal, courageous and dedicated – earning 13 Victoria Crosses between them, and they lost 45,000 lives during the two world wars. More recently, their contribution in Afghanistan highlighted not only their bravery, but also a unique affinity with our Afghan partners culturally and linguistically. Above all, these fierce fighters are one of the most highly regarded, robust and respected elements of our Army.
At the moment, unlike most ex-service personnel who have a reserve liability on leaving the forces, former Gurkhas are not routinely recruited into the reserves. As Nepalese citizens, they can only join the voluntary reserves – the Territorial Army (TA). By and large they don’t join the TA: there isn’t a culture of them joining as they could not stay in Britain until the Liberal Democrats led the campaign to change that.
Sadly, just like the rest of the regular Army, the Gurkhas have faced the bitter pill of forced redundancies as we bring down our record budget deficit. Their much-sought-after talents are currently helping private security companies, but their willingness to continue serving this country does not disappear. Instead of allowing this loss of talent and dedication to happen, the MoD must do more to retain the Gurkhas’ unique skills. We should start by giving them the reserve liability, recognising the contribution they still have to offer.
As regular reserves they can lead the way in building the Territorial Army and the regular reserve into the new future reserves. This will send a strong signal that the new, rejuvenated reserve force is more robust and battle-ready than ever.
Recruiting Gurkhas into the reserves is not only good for defence, but good for the Gurkhas too. Gurkha communities continue to feel a huge sense of prestige about the legacy of Gurkha regiments. That was why the successful campaign to give them residency rights was such a proud moment for the Liberal Democrats. It remains as important as ever that we look out for them in return for the sacrifice they have made for Britain.
A reserves White Paper is due to be published this summer. How better to build on the Gurkhas’ heritage in that White Paper than to extend reserve liability to the Gurkhas, re-form some of them as reserve regiments and offer a pathway into a second Army career as a reservist?
Nick Harvey is the Member of Parliament for North Devon and a former Minister of State for the Armed Forces
*Link for This article compiled by Roger Smith from reliable sources Nick Harvey
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*Photograph: IPF (International Pool of Friends) + DTN News / otherwise source stated
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS

Friday, August 24, 2012

DTN News - U.K. DEFENSE NEWS: U.K. Ministry of Defense Ordered 25 Foxhound Vehicles To Add To the Army's Existing Fleet

DTN News - U.K. DEFENSE NEWS: U.K. Ministry of Defense Ordered 25 Foxhound Vehicles To Add To the Army's Existing Fleet
Source: DTN News - - This article compiled by Roger Smith from reliable sources U.K. MoD
(NSI News Source Info) TORONTO, Canada - August 24, 2012: The Ministry of Defence has announced plans to procure 25 extra Foxhound vehicles to add to the Army's existing fleet.

The MOD made an initial order for 200 Foxhound vehicles in November 2010 and a further 100 were requested late last year as part of a £400m package. The latest 25 will be in addition to this at a cost of £30m.

Foxhound, the Army's state-of-the-art light protected patrol vehicle, arrived in Helmand province in June of this year.

The Minister for Defence Equipment, Support and Technology, Peter Luff, made the procurement announcement today at an event at the Army's Bulford Camp showcasing the capabilities of Service personnel from 4th Mechanized Brigade who are preparing to deploy on Operation HERRICK 17.

Mr Luff said:

"I was very pleased to be able to confirm the purchase of 25 additional new Foxhound vehicles.

"Foxhound's cutting-edge technology gives our troops the ability to engage with Afghan civilians, as they must, whilst benefiting from a high level of protection. Personnel from 4th Mechanized Brigade will be amongst the first to use this outstanding new vehicle.

"This is another example of how the MOD, having balanced the budget, is now able to confidently spend money on the equipment that our personnel really need."

Personnel from 4th Mechanized Brigade will be amongst the first to make use of the new Foxhound vehicle on operations. For its size and weight, Foxhound provides unprecedented levels of blast protection against the threats faced by troops on the front line.

Robust enough to withstand the blast from an IED, it has a top speed of 70mph (113km/h). The engine can also be removed and replaced in just 30 minutes and it can drive away from an ambush on only three wheels.

4th Mechanized Brigade will deploy to Afghanistan in October for a six-month tour as the lead formation of Task Force Helmand. Due to the significant progress in the development of the Afghan National Security Forces it will be the first brigade to oversee a drawdown of British troops from Helmand province, with the UK's military commitment there due to be cut by 500 by the end of the year.

The showcase at Bulford has enabled members of the Task Force to show off their skills, from marksmanship and search dog handling, through to the challenges of having to cook for thousands of soldiers, sailors and airmen and women on a daily basis.

Brigadier Bob Bruce, Commander of 4th Mechanized Brigade, said:

"Today has enabled many of the men and women who will deploy on HERRICK 17 to showcase not only the high quality equipment with which they will deploy but also the result of the extensive pre-deployment training that they have conducted.

"4th Mechanized Brigade previously deployed to Afghanistan in 2010, but a lot has changed since then. Now we are well down the path of transition - the handover of security responsibilities to our Afghan colleagues - and our strategic outlook is very different to what it was two years ago.

"Notably, we will be the first Task Force to see our numbers reduce during the course of our tour, a big challenge but one we will embrace.

"We are an experienced and well-balanced Task Force; while based on a regular Army formation we also have a number of regular Royal Navy and RAF Service personnel in our ranks, as well as a number of reservists who have readily volunteered their time to accompany us to the front line."

The tour will see 'The Black Rats', as 4th Mechanized Brigade is also known, working in support of the Afghan National Army's 3/215 Brigade and the Afghan National Police in their mission to bring security and stability to a region that has known years of unrest but has seen steady progress thanks to the efforts of Afghan, British and other international forces.

Approximately 10 per cent of the personnel who deploy on Op HERRICK 17 will be reservists, including elements of 6th Battalion The Royal Regiment of Scotland, 103 Battalion Royal Electrical and Mechanical Engineers, 243 (Wessex) Field Hospital and 101st (Northumbrian) Regiment Royal Artillery.

Mr Luff added:

"I was delighted to have the opportunity to meet some of the members of 4th Mechanized Brigade who will deploy to Afghanistan in the autumn and will face an entirely new challenge.

"They continue the work of their predecessor brigades and also oversee the beginning of our drawdown as Afghanistan looks ahead to a future with its own Armed Forces taking the security lead."

4th Mechanized Brigade will replace 12th Mechanized Brigade when they deploy on Op HERRICK 17 in October 2012.

*Link for This article compiled by Roger Smith from reliable sources U.K. MoD
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS

Monday, June 20, 2011

DTN News - AGUSTAWESTLAND NEWS / PARIS AIR SHOW NEWS: AW159 Makes Its First Paris Air Show Appearance

DTN News - AGUSTAWESTLAND NEWS / PARIS AIR SHOW NEWS: AW159 Makes Its First Paris Air Show Appearance
(NSI News Source Info) TORONTO, Canada - June 20, 2011: AgustaWestland, a Finmeccanica company, is pleased to announce that the first production AW159 helicopter will be making its first appearance at the Paris Air Show. Sixty two AW159s have been ordered by the UK Ministry of Defence for the Army and Royal Navy to fulfil both over land and maritime missions with a common platform. The AW159, whilst building on the pedigree of the current Lynx, is a new 6-tonne multi-role military helicopter featuring a new marinised airframe, all new avionics, new mission sensors and new generation weapon systems. The AW159 programme has achieved several major milestones so far in 2011 and continues on time and on budget ready to deliver the first aircraft to the UK Ministry of Defence at the end of 2011. The first production aircraft performed its maiden flight on 20th April 2011 at AgustaWestland’s Yeovil facility and a further six production aircraft are now undergoing final assembly on a new state-of–art assembly line.
The three trials aircraft which first flew in November 2009, October 2010 and November 2010 have now completed over 250 flying hours of a 600 hour integrated flight test programme. The three aircraft are set to undertake a number of proving trials in the coming months. Later this month aircraft #1 will start hot and high trials in the USA and aircraft #3 will undertake Shipborne Helicopter Operating Limit (SHOL) trials in October 2011. Aircraft #2s flight testing has been focusing on the successful integration of the avionics and mission sensors and recently completed chaff and flare firing trials. AgustaWestland will start to train initial British Army pilots in early 2012 and the aircraft is set to become fully operational with the Army in 2014 and the Royal Navy in 2015. The British Army’s AW159 Lynx Wildcat will perform a wide range of tasks on the battlefield including reconnaissance, command and control, transportation of troops and materiel, and the provision of force protection. The Royal Navy variant will provide an agile maritime capability providing anti-surface warfare capability and force protection and will operate in support of amphibious operations and be an important element in defending ships against surface threats. There will be a high degree of commonality between the Army and Royal Navy helicopters that will mean that an aircraft can switch roles easily, principally through the changing of role equipment.
In March 2011 AgustaWestland signed a contract with the UK Ministry of Defence (MoD) to design and develop an integrated training solution for the AW159 Lynx Wildcat helicopter which includes the building and equipping of a state-of-the-art training centre at RNAS Yeovilton in South West England, alongside Royal Navy and British Army AW159 Lynx Wildcat squadrons. The facility will provide training courses for Army aircrew and maintainers starting in January 2013, with training for Royal Navy aircrew and maintainers starting in January 2014. The Lynx Wildcat Training Centre will be equipped to provide air crew and maintainer training using a wide range of synthetic training technology including two Full Mission Simulators (FMS), Flight Training Device (FTD) and Cockpit Procedures Trainer (CPT). All devices will be capable of delivering Army or Royal Navy conversion and mission training. Each of the Full Mission Simulators has six degrees of freedom to provide the acceleration sensations associated with helicopter flying together with a visual system that complies with JAR-FSTD-H Level D, to give highly realistic and cost effective training. The maintenance training facility will be equipped with a suite of synthetic training devices covering the aircrafts mechanical, avionic and weapon systems. The training centre will also contain a suite of briefing rooms, integrated electronic classrooms and a learning management system will be operational and providing training for the Army from early 2013 and for Royal Navy from early 2014. AgustaWestland is also working with the UK MoD to develop an Integrated Operational Support (IOS) solution to provide cost effective through life support for the entire fleet of 62 aircraft. The AW159 programme for the UK MoD continues to be on time and on budget and was the first major project to be awarded under the Strategic Partnering Arrangement signed by the UK Ministry of Defence and AgustaWestland in June 2006. AgustaWestland has also signed partnering agreements with a number of key suppliers on the AW159 programme including Selex Galileo, a Finmeccanica company; GKN Aerospace, LHTEC – a partnership between Rolls-Royce and Honeywell, General Dynamics UK, Thales UK and GE Aviation.
AgustaWestland Related News;
Located in strategic sites around the globe based on regional demand and requirements, AgustaWestland’s Technical Representatives are now numbering more than 40 and this will be increased to more than 50 by 2012.
SEE MORE
AgustaWestland boasts a strong presence in Malaysia as well as in the region and operators will benefit from ever increasing levels of service quality, whilst also reducing operating costs.
SEE MORE
This order adds to the contract for three offshore-configured AW139s in 2010 and is part of a Framework Agreement for the purchase of a total of five AW139s plus options for additional four.
SEE MORE
The AW149 is the only all new aircraft in its class and is ideally suited to replace thousands of older and ageing helicopters over the next 30 years.
A new generation affordable multi-purpose twin-engine 8-tonne class helicopter designed in response to the growing market demand for higher payload, longer range and higher productivity.
SEE MORE
The company has signed for two EMS-configured GrandNew light twin helicopters and four GrandNew light twin and one AW139 medium twin helicopters for offshore transport.
SEE MORE
As the first AgustaWestland Authorized Service Centre in Russia for the AW139, the appointment of HeliClub marks a significant milestone in AgustaWestland’s strategy to expand its presence in Russia.
SEE MORE
This latest contract brings the total amount of AW139s sold in Russia and the CIS countries to fifteen in just two years.
SEE MORE
This customer adds to the long list of operators who have chosen products from the AgustaWestland's range of light twins for corporate transport duties in Australia.
SEE MORE
The contract marks the entrance of the GrandNew model into the Turkish helicopter market.
SEE MORE
AgustaWestland is committed to exceeding its customer’s expectations and believe the modern, best selling AW139 will be a valued asset for the Egyptian Air Force’s helicopter fleet
*Speaking Image - Creation of DTN News ~ Defense Technology News
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News

©

COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS

Wednesday, August 25, 2010

DTN News: British Forces Jackal Keeps Proving Its Worth In Afghanistan

DTN News: British Forces Jackal Keeps Proving Its Worth In Afghanistan
Source: MoD UK
(NSI News Source Info) LONDON, U.K. - August 25, 2010: When purchase of the latest batch of Jackal vehicles was announced at Defence Equipment & Support's Defence Vehicle Dynamics event in June 2010 it took the number of Jackal vehicles procured for UK forces to more than 500. The announcement, by Defence Equipment, Support and Technology Minister Peter Luff, to procure another 140 of the 2A version of the weapons-mounted patrol vehicle at a cost of £45m was another vote of confidence in a vehicle which has enabled British patrols to keep in touch with the enemy, often in the toughest of Afghan terrain. Around 40 of the Jackal 2As are due to be delivered this month. Jackal is the best known of the high mobility transporter vehicles delivered by Babcock over the last few years. The original contract to produce the vehicles was signed as an Urgent Operational Requirement in 2007. The contract has since delivered with huge success. Jackal vehicles are produced by Babcock under an alliance with Supacat, the prime contractor and design authority. Supacat is responsible for design, development, prototyping, integration and programme management, while Babcock takes responsibility for detailed production planning, purchasing and manufacture at its Devonport factory. Perfect partnership has been the key for the project co-ordinators at Defence Equipment & Support (DE&S). Alan Stephen, DE&S' high mobility transport vehicle project manager, said: "The success of the Jackal programme has been grounded on a combined effort between the project team and industry, who have shown great will to achieve and the ability to take risk to continue delivery. "My team is thoroughly committed to achieving the best solution for the soldier on the ground, as early as possible, as economically as possible. "We can't rest on our laurels though, and are continually examining ways of making an excellent vehicle even better. Regular good communications direct with theatre and excellent backbriefs from returning brigades assist in identifying where we should be looking at improvements. "Of course it does help motivation that it's a very well-liked vehicle which has delivered an important capability to Operation HERRICK." The vehicles are built by a team of up to 130 Babcock employees working on the Devonport pulse production line, along with a smaller project management team of 25. The pulse production line involves dividing the total manufacturing activity into a series of 12 equally balanced packages or 'cells', and the vehicle is physically moved, or 'pulsed', from one area assembly to the next on a daily basis. Application of a 'lean' philosophy has identified and eliminated any non-value-adding activities, and serves to ensure that the demanding delivery schedules and critical quality and reliability requirements are met. This is coupled with highly effective supply chain management to reduce lead times, ensure quality and reliability, manage obsolescence, and ultimately drive down the cost of construction and ownership. Production runs at a rate of one vehicle a day. Babcock Land Systems Director, Chris Dunn, said: "The Jackal vehicle has been a resounding success, having proved its versatility; combining speed and manoeuvrability with unparalleled cross-country performance over Afghanistan's harsh terrain." We are delighted to be working in alliance with Supacat to deliver these vehicles reliably and consistently within the shortest possible timescales. "Further, we have established Babcock as a company that can be relied upon to deliver vehicles of exceptional quality at record pace and, being OEM [Original Equipment Manufacture] independent, we are also talking to other vehicle designers about building their vehicles for upcoming programmes in the UK and abroad." Jackal - the story so far... *In service are three Army variants based on the high mobility transporter - the 4x4 Jackal in three variants (1, 2 and 2A), the 6x6 Coyote and the 6x6 MEP (Military Enhancement Programme) vehicle. *The MEP was procured as the base vehicle for the Soothsayer programme, which was cancelled in 2009 - 35 vehicles were produced. *The first Jackal contract was placed on 28 July 2007, and the first vehicles entered service in November 2007 - vehicles were in theatre in early 2008. *Follow-on buys occurred in 2008 to bring the total to more than 200. *On 9 April 2008, the contract was signed for more than 100 more Jackals - these were at the Jackal 2 build standard and entered service in August 2009. *On 12 May 2010, a contract was signed for around 140 Jackal vehicles, at the Jackal 2A build standard. *Approximate contract value of the various buys is £174m for Jackal 1 and £45m for Jackal 2A. *More than 70 Coyote vehicles have been built - the Coyote is the light vehicle in the Tactical Support Vehicle family and entered service in August 2009. *The Jackal 2 contract and the Coyote contract were awarded together, with the number of vehicles changing during the buy - the combined value of the two contracts is £140m. This article is taken from August 2010 edition of desider - the magazine for Defence Equipment and Support.
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News, contact: dtnnews@ymail.com

Sunday, August 15, 2010

DTN News: British Army To Use 'Dirty Harry' Bullet Against The Taliban

DTN News: British Army To Use 'Dirty Harry' Bullet Against The Taliban
Source: DTN News - - This article compiled by Roger Smith from reliable sources including DailyMail.co.uk By Christopher Leake
(NSI News Source Info) TORONTO, Canada - August 15, 2010: British troops are to be issued with a new 'super-bullet' to fight the Taliban as their current ammunition does not have the punch to kill the enemy at long range.

The high-performance round will be fired from standard-issue SA80 assault rifles. Nicknamed the 'Dirty Harry round' after the powerful bullets used by Clint Eastwood in the 1971 movie, it is expected to be on the front line in Afghanistan by 2011.

Its development by UK defence firms BAE Systems and QinetiQ follows Army concern in Helmand Province, Afghanistan, last year that the standard 5.56mm SA80 round was failing to hit its target at distances of more than 400 yards.

British troops are to be issued with a new 'super-bullet' to fight the Taliban as their current ammunition does not have the punch to kill the enemy at long range

British troops are to be issued with a new 'super-bullet' to fight the Taliban as their current ammunition does not have the punch to kill the enemy at long range

The Taliban use more powerful rounds in Russian-designed AK-47 rifles to hit British forces at a range of 600 yards. Now the British troops' new round will even up the odds.

The new bullet gives greater range and force against human targets and light vehicles. Because it is the same calibre as the standard bullet, the SA80 rifle will not need modification.

Military sources say initial trials have been successful. Pending formal approval, the MoD is expected to order up to one million rounds.

A senior Royal Marines officer just back from Afghanistan said the new bullet would be welcomed on the front line.

He said: 'It will give our infantry soldiers an edge which at present we are lacking.' An MoD spokeswoman said: 'We work closely with industry to ensure equipment is continuously improved.'

*Link to this article from source; "British Army To Use 'Dirty Harry' Bullet Against The Taliban - DailyMail.co.uk By Christopher Leake"
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News, contact:dtnnews@ymail.com

Friday, July 02, 2010

DTN News: UK Ministry Of Defence Signs Scout SV Contract With General Dynamics UK

DTN News: UK Ministry Of Defence Signs Scout SV Contract With General Dynamics UK
Source: DTN News / General Dynamics UK
(NSI News Source Info) LONDON, U.K. - July 3, 2010: The UK Ministry of Defence (MoD) has signed a contract with South Wales-based General Dynamics UK to deliver the Specialist Vehicle (SV) for the British Army. The demonstration phase, which has been activated by the signature of the contract by Peter Luff MP, Parliamentary Under Secretary of State and Minister for Defence Equipment, Support & Technology is worth £500m. The demonstration phase will see the development of seven prototypes for the Scout reconnaissance vehicle and supporting variants built on the ASCOD SV Common Base Platform, as well as providing associated training equipment. ASCOD SV, which is a modified military off the shelf (MMOTS) platform already proven in service with a number of NATO allies, will replace the ageing CVR(T) fleet and will introduce new vehicle roles. “The MoD chose General Dynamics UK’s ASCOD SV because it guaranteed the best protection for British troops, the best value for money for the British taxpayer, the best deal for the UK Industrial base, the best integrated solution, and the best growth potential for the British Army to combat future threats throughout the 30-year lifespan of the vehicle,” commented Dr. Sandy Wilson, president and managing director of General Dynamics UK. “I am particularly proud that this vehicle has been designed in Britain by British engineers and will provide jobs for British workers, as well as saving the lives of British military personnel wherever they may be in the world over the next 30 or so years,” continued Dr. Wilson. “My team and I at General Dynamics UK look forward to working in partnership with the MoD over the next several years to deliver the vehicle the British Army deserves and needs in order to do their difficult jobs in the safest and most effective manner possible.” Key advantages that the ASCOD SV delivers to the MoD include: A modern drivetrain, which is good for the 30-year life of the vehicle and thereby obviates the need for a mid-life upgrade; Load-carrying potential of up to 42 tonnes with a growth path to 45 tonnes, which provides the ability to meet future threats likely to appear over its entire 30-year life, as well as carry its heaviest variants; A Common Base Platform that will support variants such as an Armoured Personnel Carrier, Protected Mobility vehicle, a Repair vehicle and a Recovery vehicle; An open electronic architecture, available across all variants, which will make the SV fleet easier to maintain, ease the training burden, and play a key role in lowering costs throughout the life of the vehicles; and An advanced turret design which, because of its internal space and leading ergonomics, delivers improved survivability and fightability for its crew. General Dynamics UK has sub-contracted Lockheed Martin UK Ampthill to produce the turret. ASCOD SV also has high export potential, as required under the Defence Industrial Strategy. The trials of the prototype vehicles are expected to begin with the Army no later than 2013. Once the demonstration phase is successfully completed, the MoD will be in a position to proceed to the Manufacture Phase and begin production of these battle-winning vehicles. For all media materials including broadcast quality B-roll and Video log on to http://www.generaldynamics.uk.com/ASCODSV/