Tuesday, September 14, 2010

DTN News: Russian Aircraft Carrier Readies For Training Mission

DTN News: Russian Aircraft Carrier Readies For Training Mission
Source: DTN News / Ria Novosti
(NSI News Source Info) MURMANSK, Russia - September 15, 2010: Russia's only aircraft carrier, the Admiral Kuznetsov, has left a dry dock after scheduled repairs and is getting ready for a training mission in the Barents Sea, the Northern Fleet said in a statement. "The Admiral Kuznetsov aircraft carrier will sail to the Barents Sea at the end of September on a training mission relevant to its main purpose," the statement said. The warship was assigned to the Northern Fleet in January 1991. It is capable of carrying 26 Su-33 Flanker-D and MiG-29K Fulcrum-D carrier-based fighter jets, and 24 anti-submarine helicopters. The upcoming mission will most likely involve a comprehensive program of naval pilot training to further develop the skills acquired by pilots at the Nitka Naval Pilot Training Center in Ukraine. The Admiral Kuznetsov is expected to be docked at Sevmash shipyards in 2012 for full-scale modernization, which will continue for at least five years. Russia is aiming to finish drafting plans for a new nuclear-powered aircraft carrier for its Navy by 2012 and build at least three of the ships for its Northern and Pacific fleets.

DTN News: US Air Force Takes 'Cautious' Approach To New Bomber

DTN News: US Air Force Takes 'Cautious' Approach To New Bomber
Source: DTN News - - This article compiled by Roger Smith from reliable sources
(NSI News Source Info) WASHINGTON - September 15, 2010: The US military remains committed to building a new long-range bomber but will take a "cautious" approach to avoid costly disasters from past weapons programs, the Air Force's top official said Monday. The "long-range strike" project also will be focused mainly on delivering conventional rather than nuclear weapons, Air Force Secretary Michael Donley said. While the Air Force was "confident" about the need to develop a new way to strike at a long-distance, it was mindful of past mistakes in bomber programs plagued by delays and cost overruns, he said. "We approach the issue with both confidence and caution," Donley told the Air Force Association. "Cautious not to repeat the painful experience of previous Air Force bomber programs: narrowly focused capabilities, high risk technologies, and high costs contributing to affordability problems, leading to program cancellations, or low inventories," he said. His comments reinforced warnings from Defense Secretary Robert Gates, who has vowed to streamline how the Pentagon operates to free up money for urgent needs and vital weapons. In a press conference after his speech, Donley cited problems with the F-111, B-1 and B-2 bombers, and said the Air Force wanted to rely on proven, existing technologies instead of breaking new ground for the next generation bomber. He said the fleet would need to be large enough to last over a 30-year period, unlike the B-2 bomber fleet that ended up much smaller than hoped due to high costs.
Twenty B-2s are operated by the United States Air Force. The cost of each aircraft averaged US$737 million in 1997 dollars. Total procurement costs averaged US$929 million per aircraft, which includes spare parts, equipment, retrofitting, and software support. The total program cost, which includes development, engineering and testing, averaged US$2.1 billion per aircraft (in 1997 dollars). Donley also said the long-range platform could be an aircraft or a missile, and that nothing had been ruled out while military planners review various studies on the project. The Air Force would unveil more details for the program in the proposed budget for fiscal year 2012, he said.

DTN News: U.S. Department of Defense Contracts Dated September 14 2010

DTN News: U.S. Department of Defense Contracts Dated September 14 2010 Source: U.S. DoD issued No. 825-10 September 14 2010 (NSI News Source Info) WASHINGTON - September 15 2010: U.S. Department of Defense, Office of the Assistant Secretary of Defense (Public Affairs) Contracts issued September 14 2010 are undermentioned;

CONTRACTS

U.S. SPECIAL OPERATIONS COMMAND

McNeil Technologies, Inc., Springfield, Va., has been awarded a $500,000,000 maximum value, five-year indefinite-delivery/indefinite-quantity linguist support services contract by U.S. Special Operations Command. The contractor will provide all personnel, equipment, tools, materials, supervision/management, and other items and services necessary to provide foreign language interpretation, transcription, reporting, and translation services to support overseas contingency operations. The initial obligation amount is $50,000,000 for the first task order. The contract number is H92222-10-D-0007.

AIR FORCE

Lockheed Martin Corp., Lockheed Martin Space Systems Co., Sunnyvale, Calif., was awarded a $57,000,000 contract modification which will provide for space vehicle preparation and shipping to the launch site, pre-launch check-out, fueling, weighing, final closeouts, integration with launch vehicle and space vehicle launch. At this time, $6,860,855 has been obligated. MSCW/PKA, Los Angeles Air Force Base, Calif., is the contracting activity (F04701-02-C-0002; PO0409).

Booz Allen Hamilton, Inc., Herndon, Va., was awarded a $24,800,278 contract which will provide Naval Undersea Warfare Center Newport Experimentation Planning and Concept Generation/Development Survivability Analysis. At this time, $224,500 has been obligated. 55 CONS/LGCD, Offutt Air Force Base, Neb., is the contracting activity (SP0700-03-D-1380; Delivery Order 382).

Booz Allen Hamilton, Inc., Herndon, Va., was awarded a $17,999,463 contract which will provide Criminal Investigation Task Force All-Source Intelligence Analysis. At this time, $3,500,000 has been obligated. 55 CONS/LGCD, Offutt Air Force Base, Neb., is the contracting activity (SP0700-03-D-1380; Delivery Order 375).

Sierra Nevada Corp., Sparks, Nev., was awarded a $12,472,304 contract which will provide consoles for integration onto MC-130W aircraft. At this time, the entire amount has been obligated. ASC/WISS, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8629-09-C-2445).

BAE Systems Technology Solutions & Services was awarded a $6,300,788 contract modification which will provide non-personal services to operate, maintain and support the Perimeter Acquisition Radar Attack Characterization System and site at Cavalier Air Force Station, N.D. At this time, no funds have been obligated. 21 CONS/LGCZB, Peterson Air Force Base, Colo., is the contracting activity (FA2517-09-C-8000; PO0043).

NAVY

SRI International, Menlo Park, Calif., is being awarded a $22,540,804 firm-fixed-priced contract to provide Flextrain System multi-mission training support to the Army National Guard. This requirement is for the Flextrain System to support the Exportable Combat Training Capability and Mobile Virtual Training Capability for Army National Guard. Flextrain provides multi-level/multi-mission support in a wide variety of training environments. Work will be performed in Menlo Park, Calif., and is expected to be completed by September 2011. Contract funds will expire at the end of the current fiscal year. This contract was not competitively procured. The Naval Surface Warfare Center, Indian Head, Md., is the contracting activity (N00174-10-C-0058).

Electric Boat Corp., Groton, Conn., is being awarded a $17,903,100 cost-plus-fixed-fee contract under previously awarded basic ordering agreement contract (N00024-10-G-4314) to support submarine repair work at Portsmouth Naval Shipyard on Los Angeles-class and Virginia-class submarines during on-going availabilities. Ships scheduled to undergo maintenance availabilities repairs include USS Virginia (SSN 774) and USS San Juan (SSN 751). Work will be performed in Portsmouth, N.H., and is expected to be completed by March 2011. Contract funds will expire at the end of the current fiscal year. The Supervisor of Shipbuilding, Conversion and Repair, Groton, Conn., is the contracting activity.

DEFENSE LOGISTICS AGENCY

SmithKlineBeechman, dba GSK, Philadelphia, Pa., is being awarded a maximum $21,337,380 firm-fixed-price, sole-source contract for medical supplies. There are no other locations of performance. Using services are Army, Navy, and Air Force. There was originally one proposal solicited with one response. The date of performance completion is Dec. 30, 2011. The Defense Logistics Agency Troop Support, Philadelphia, Pa., is the contracting activity (SPM2DP-10-C-0001).

DTN News: Lockheed Martin Continues To Meet And Exceed F-22 Raptor Production And Delivery Schedule

DTN News: Lockheed Martin Continues To Meet And Exceed F-22 Raptor Production And Delivery Schedule
Source: DTN News / Lockheed Martin
(NSI News Source Info) MARIETTA, Ga.,- September 15, 2010: Lockheed Martin [NYSE: LMT] continues to meet and exceed the production and delivery schedule for the F-22 Raptor, with 86 straight aircraft delivered on or ahead of schedule to the U.S. Air Force. To date, the company has delivered 166 production F-22s, including 13 this year.
The F-22 EMD program marked a successful first flight on September 7, 1997. The flight test program, which has already begun in Marietta, Georgia, will continue at Edwards AFB, California through the year 2001. Low rate production is scheduled to begin in FY99. The aircraft production rate will gradually increase to 36 aircraft per year in FY 2004, and will continue that rate until all 339 aircraft have been built (projected to be complete in 2013). Initial Operational Capability of one operational squadron is slated for December 2005.The F-15 fleet is experiencing problems with avionics parts obsolescence, and the average age of the fleet will be more than 30 years when the last F-22 is delivered in 2013. But the current inventory of F-15s can be economically maintained in a structurally sound condition until 2015 or later. None of the 918 F-15s that were in the inventory in July 1992 will begin to exceed their expected economic service lives until 2014. Media Contact: Chris McGee
Office: 770-494-2578
Mobile: 770-289-3309

DTN News: Future Missile System For Gripen

DTN News: Future Missile System For Gripen
Defence and security company Saab has received an order from FMV (the Swedish Defence Materiel Administration) regarding the integration of the active radar-guided Beyond Visual Range (BVR) missile, Meteor. The order is worth MSEK 312 spread over four years.
Source: DTN News / SAAB
(NSI News Source Info) LINKOPING, Sweden - September 15, 2010: The integration means that Meteor will be adapted to other Gripen systems, such as the radar and displays. The order includes test flights and test firing, as well as the integration of Meteor with support and maintenance systems such as simulators and planning computers. The Swedish Gripen C/D aircraft will also have a two-way datalink for communication between the aircraft and the missile once it has been fired. "Meteor has substantially better performance than any other BVR missile existing today, which will obviously increase Gripen's ability to defend against other aircraft," says Lennart Sindahl, Head of business area Aeronautics within Saab. "The fact that Gripen is also being used internationally as an airborne platform in the development of Meteor shows that we have a technical level in Sweden that few other countries can match." Gripen has been used since 2006 as the test aircraft for the development of Meteor. Multiple missiles have been fired from Gripen to date. This experience can now be utilised for a more cost-effective integration of Meteor with the Swedish Armed Forces' Gripen C/D. The order mainly concerns Saab's operations in Linköping and to some extent Gothenburg. Saab serves the global market with world-leading products, services and solutions ranging from military defence to civil security. Saab has operations and employees on all continents and constantly develops adapts and improves new technology to meet customers’ changing needs. Meteor has been designed to defeat current and future threats at beyond visual range, with an understanding performance that will totally redefine an aircraft's air combat capability. Meteor has the largest No Escape Zone of any air-to-air weapon, resulting in a long stand-off range and high kill probability that ensures air superiority and pilot survivability. The programme is on schedule to deliver the first production deliveries in 2012 and is the result of a successful six-nation European collaboration, in which Saab Dynamics of Sweden is a partner of the prime contractor, MBDA. The Gripen is the first of the new generation fighter aircraft to enter service and the first to be used for firing Meteor, the high-tech beyond visual range missiles of the future. Using the latest available technology it is capable of performing an extensive range of air-to-air and air-to-surface operational missions and employing the latest weapons. Gripen, designed to meet the demands of current and future threats, is in service with the Swedish, Czech Republic, Hungarian and South African Air Forces and has also been ordered by the Royal Thai Air Force. The UK Empire Test Pilots´ School (ETPS) is also operating Gripen as its advanced fast jet platform for test pilots world wide.

Monday, September 13, 2010

DTN News: Indian Dhruv Helicopter Gets Italian Makeover

DTN News: Indian Dhruv Helicopter Gets Italian Makeover
Source: DTN News / Business Standard
(NSI News Source Info) NEW DELHI, India - September 14, 2010: The Dhruv Advanced Light Helicopter (ALH) has been widely regarded as a triumph of indigenous military rotorcraft design and manufacturing.

'Indian' Dhruv copter gets Italian makeover

Scores of Dhruvs already flying in army colours will be joined by another 159, which the military ordered last year from Hindustan Aeronautics Limited (HAL). And, Ecuador's air force chose the Dhruv ALH in an international tender in 2008 for seven helicopters.

But now it emerges that the Dhruv is struggling with a serious problem. The army, which was to be supplied 20 Dhruvs last year, refused to accept any until HAL fixed a problem that was restricting the Dhruv's cruising speed to 250 kilometers per hour, significantly short of the 270 kmph that HAL specifications promise. Unable to find a cure, HAL has brought in a consultant: Italian aerospace propulsion major, Avio.

India's military sets high store by the Dhruv's engine power; the helicopter must operate from tiny landing grounds at 6,500 meters (about 21,000 feet), which is the altitude of Sonam Post, India's highest helipad on the Siachen Glacier.

But even after paying French engine-maker, Turbomeca, Rs 1,000 crore to design the Shakti engine -- - a superb performer at high altitudes -- - the Dhruv's Integrated Dynamic System, or IDS, which transfers power from the Shakti engines to the helicopter rotors, is not performing optimally. That, say HAL engineers, has reduced speed, high-altitude capability, and the life of the IDS.

The Italian consultants will now scrutinise the Dhruv's IDS to diagnose the problem. Avio will start by building a single HAL-designed IDS in Avio's facilities in Italy, using their own materials and tools.

'Indian' Dhruv copter gets Italian makeover

They will then test-run this for 400-500 hours; if it works perfectly, it would be evident that the flaw lies in HAL's manufacturing, rather than the IDS design. On the other hand, if the Avio-built IDS performs poorly during the test run, there is clearly a design problem. Avio will then redesign the IDS.

A senior HAL official explained to Business Standard: "Avio will review the whole design, on a purely consultancy basis. They will give us a redesign... that will be the first phase. We will have to translate that new design into an engineered product. And, after that, we'll have to do the ground testing and the flight-testing. It will be a long-drawn affair."

Avio, Business Standard has learned, was HAL's second choice. But the first choice consultant, an American company, had so much work on its plate that it had to turn HAL away.

'Indian' Dhruv copter gets Italian makeover

Meanwhile, India's army and air force -- strapped for helicopters -- have no choice but to accept and fly Dhruvs, even though they are performing below par and metal keeps chipping off inside the IDS. HAL has itself implemented six changes inside the IDS and 30 helicopters have been flying with these changes for some 400 hours. So far, there has been no major problem.

"This is not dangerous for the pilots", says a senior HAL official. "Heavy chipping of metal would warn us about an impending failure of the IDS. There is a monitoring system inside the IDS, which checks for the presence of tiny metal chips in the oil. There is no danger of sudden, catastrophic failure in flight."

'Indian' Dhruv copter gets Italian makeover

Top officials in the Ministry of Defence have conveyed strong displeasure to HAL over what they consider a "sloppy" work culture. Talking to Business Standard on condition of anonimity, a MoD official points out, "The Avio consultancy will place HAL's work culture under serious scrutiny.

To identify the fault in the Dhruv's IDS, Avio has insisted on auditing HAL's facilities and practices. This will amount to a full external audit, which will highlight systemic and procedural problems that HAL would never have identified on its own."

But the MoD also accepts that the aerospace establishment, hungry for success, developed the Dhruv in haste and introduced it into operational service without adequate testing.

'Indian' Dhruv copter gets Italian makeover

Illustrating this point, the MoD official says: "The IAF asked for about 75 design changes while HAL was developing the Dhruv. This prevented a coherent and systematic design process. And, thereafter, HAL was too eager to introduce the Dhruv into service. It has now emerged that it was unwise of HAL, and of the IAF, to operationalise the Dhruv before the design was fully stabilised."

This year, the army and the IAF will introduce 31 new HAL-built Dhruv Mark 3 helicopters into service. These are part of an order placed on HAL last year for 159 Dhruv helicopters to be supplied by 2015.

Of these, 83 are utility helicopters called Dhruv Mark 3, used for transporting people. The other 76 are Mark 4 helicopters, which will be fitted with cannons, rockets, missiles and electronic warfare equipment. These are called Dhruv (Weapon Systems Integrated), or Dhruv (WSI).

Saturday, September 11, 2010

DTN News: India, Russia Sign Deal On Military Aircraft Production

DTN News: India, Russia Sign Deal On Military Aircraft Production
Source: DTN News / Ria Novosti
(NSI News Source Info) NEW DELHI, India - September 12, 2010: India and Russia on Thursday agreed to set up a joint venture to manufacture a military transport plane. Under the deal, each party will pay $300.35 million to the JV's charter capital. Hindustan Aeronautics Ltd (HAL) and United Aircraft Building Company expected to sign a deal in March during Prime Minister Vladimir Putin's visit to New Delhi, but India failed to get the paperwork ready and the signing was delayed. Manufacturing facilities will be set up both in Russia and in India. A total of 205 planes are to be made, 30% of which may be exported to third countries. Russia and India signed an intergovernmental agreement on the joint development and manufacturing of the Medium Transport Aircraft (MTA) in 2007. The first MTA is expected to make its maiden flight in 2016-18.
DTN News: World Top Stories / Headlines - News Dated September 11, 2010 Source: DTN News - - This article compiled by Roger Smith from reliable sources
(NSI News Source Info) TORONTO, Canada - September 11, 2010: Comprehensive daily news related to World Top Stories for the world of TODAY.